Wales Millenium Centre
Cardiff
This
theatre has some challenging aspects for . A number of slate walls are required to be constructed from
local supplies of blue, grey, green and red slate. The craftsmen will be
expected to lay the random sized chunks of slate in order to produce a
smooth surface whilst maintaining a 2 degree slant from vertical.
25,000
square metres of blockwork and 1500 of face brickwork complete the
package.
PROJECT
DURATION: 36 weeks |